Installation Menu
Laser-leveled hanging for every wall
Standard appointments include museum-grade brass hardware, heavy stud anchors, and laser verification so your frames stay perfectly secure.
100%
stud anchored
2 hr
arrival windows
Our Method
How an appointment works
01
02
03
Wall inspection
Hardware selection
Alignment check
We check drywall composition, stud spacing, and weight limits before starting.
We match your frames with proper brass hooks and secure wall anchors.
We use laser levels to verify height and straightness down to the millimeter.